Apartment Handover Checklist: 15 Things to Inspect Before You Take the Keys

Before You Take the Keys: Why a Handover Inspection Matters

An apartment handover checklist is the list of things you inspect and collect on the day the builder hands your flat over to you. It is the last point at which the builder fixes small problems easily, and the first point at which the home becomes your responsibility.

Quick answer: check the documents first, then walk through the flat room by room, then inspect the common areas. Note every problem in writing, and take the keys only when the builder agrees to fix them.

Many buyers feel rushed on handover day. There is excitement, family and paperwork, and small defects get missed. Use this apartment handover checklist as a printable list and take your time. We are Forus Builders, and we have built apartments and villas in Thrissur for over 20 years. We wrote this the way we would want a buyer to inspect any home, including ours.

The 15 Things to Check

Documents (Checks 1 to 4)

  • 1. Completion and occupancy documents: has the building received the approvals it needs?
  • 2. Final area: does the flat match the area in your agreement?
  • 3. Payment statement: are all payments recorded and settled correctly?
  • 4. Keys, warranties and manuals: do you have everything that came with the flat?

Inside the Flat (Checks 5 to 11)

  • 5. Walls and ceilings: finish, cracks and damp patches.
  • 6. Flooring: level, joints and loose tiles.
  • 7. Doors and windows: opening, closing, locks and sliding tracks.
  • 8. Electrical: switches, sockets and the main board.
  • 9. Plumbing and water: taps, pressure and leaks.
  • 10. Bathrooms: slope, drainage and fittings.
  • 11. Kitchen: counter, sink and wall tiles.

Common Areas and Services (Checks 12 to 15)

  • 12. Lifts: working condition and capacity.
  • 13. Fire safety: the fire-fighting system and exits.
  • 14. Parking and access: your space, ramps and lighting.
  • 15. Security and power backup: CCTV, intercom and generator.

Let us go through the apartment handover checklist one group at a time.

Documents: Checks 1 to 4

Start with the paperwork, before you walk through the flat. This part of the apartment handover checklist protects you legally, and it is much harder to fix after you have taken the keys.

1. Completion and Occupancy Documents

Ask the builder which approvals and certificates are available for the building at handover, and ask to see them. Your lawyer can tell you which ones apply to your project.

What to ask

  • Is the building completed as per the approved plan?
  • Which certificates from the local body are available now?
  • Are the electricity and water connections in place?

2. Final Area of Your Flat

The area in your sale agreement should match the area of the flat you receive. Ask for the final area statement, and compare it with the agreement and the floor plan.

What to ask

  • Does the final carpet area match the RERA area in the agreement?
  • If there is a difference, how is it adjusted in the payment?

You can check the registered details of a project on the Kerala RERA website.

3. Payment Statement

Before the final payment, ask for a statement showing every amount you have paid, with dates and receipts. Check it against your own records and your payment schedule.

What to ask

  • Are all instalments recorded, and is any amount still due?
  • Are there any charges that were not mentioned in the agreement?

4. Keys, Warranties and Manuals

Collect every item that comes with the flat, and keep them together in one folder with your agreement and receipts. Think of this folder as your apartment handover checklist file for the years ahead.

What to collect

  • All sets of keys, access cards and remotes
  • Warranty and service details for the fittings and equipment supplied
  • The final floor plan and the electrical and plumbing layouts, if available
  • The contact number of the person who handles complaints after handover

This is one of the most important items on any apartment handover checklist.

Inside the Flat: Checks 5 to 11

Now walk through the flat, one room at a time. Go in daylight, switch on every light and open every tap. This is the longest part of the apartment handover checklist, so give it at least two hours and bring a notebook, a phone charger and a torch.

5. Walls and Ceilings

Walls show the quality of the finish and the first signs of any water problem. Look at them in daylight and again with the torch held at an angle, which makes unevenness easy to see.

What to look for

  • Even paint with no patches, drips or roller marks
  • Cracks, especially near corners, windows and door frames
  • Damp stains or bubbling paint on walls and ceilings

6. Flooring

Walk across every room slowly. Floors should feel level underfoot, and the joints between tiles should be even and clean. Flooring is easy to miss on an apartment handover checklist, so give it proper time.

Flooring is easy to miss on an apartment handover checklist, so give it proper time.

What to look for

  • Tiles that sound hollow when you tap them gently with a coin
  • Chipped or cracked tiles and uneven joints
  • A smooth transition between rooms and at the balcony door

7. Doors and Windows

Open and close every door and window at least twice. Kerala’s monsoon will test the seals and tracks, so check them carefully now.

What to look for

  • Doors that close properly, without rubbing against the frame
  • Locks, latches and bolts that work with every key
  • Sliding windows that glide smoothly and lock firmly
  • Glass free of scratches and gaps around the frames

8. Electrical Points

Test every switch and every socket yourself. Plug in your phone charger at each socket, because a socket that looks fine can still be dead.

Electrical faults are among the most common entries on any apartment handover checklist.

What to look for

  • Every light, fan and socket working from its own switch
  • Switches and sockets fixed firmly, with no loose plates
  • A clearly labelled main board with working circuit breakers
  • Enough points in the kitchen and bedrooms for your appliances

9. Plumbing and Water Supply

Open every tap, shower and flush. Check the water pressure, and then check underneath for leaks.

Any leak you find goes on the apartment handover checklist and gets fixed before you move in.

What to look for

  • Steady water pressure at every tap, hot and cold where provided
  • No dripping under sinks, basins or behind toilets
  • Flushes that work properly and refill quickly

10. Bathrooms

Bathrooms are where most hidden problems appear later. Pour a bucket of water on the floor and watch where it goes.

Bathrooms deserve extra minutes on your apartment handover checklist.

What to look for

  • Water flowing towards the drain, with no pools in corners
  • Tiles that are not cracked or loose, and grouting that is complete
  • Fittings that are firmly fixed and working: taps, shower, flush and exhaust

11. Kitchen

The kitchen is the part of the home you use most. Imagine your daily cooking, and check that the space supports it.

What to look for

  • A counter that is level, with no chips or cracks along the edges
  • A sink that is firmly fixed, with water draining quickly
  • Wall tiles that are straight and complete behind the cooking area
  • Provision for a gas connection and a chimney, if you plan to install one

Write down every problem you find, with the room name and a photo. A clear, dated list makes it easy to agree what the builder will fix before you take the keys. Keep this list with the rest of your apartment handover checklist papers.

Apartment handover checklist: Forus Lavender construction progress, Thrissur

Common Areas and Services: Checks 12 to 15

Your flat is only part of what you are taking over. The lift, the stairs, the parking and the security system are shared, and you will use them every day. Finish your apartment handover checklist by walking through the building once you have inspected your own flat.

12. Lifts

A lift that is slow or unreliable becomes a daily problem, especially in a tall building. Ride it yourself, from the basement or parking level to the top floor, and watch how it behaves.

Never leave the lift off your apartment handover checklist.

What to look for

  • Smooth starts and stops, with the floor level matching at every landing
  • Doors that open and close without jerking
  • A working alarm, emergency button and light inside the car
  • The lift capacity displayed, and a certificate or service contract for the lift

13. Fire Safety

You hope never to need it, which is why you should check it on handover day. Ask the builder to show you the fire-fighting arrangements and the way out of the building.

What to look for

  • Fire extinguishers and fire-fighting points on each floor, with visible markings
  • Clear staircases with no stored items or locked doors
  • Exit signs and emergency lighting in the corridors
  • Details of who maintains the system after handover

14. Parking and Access

Many buyers check the flat carefully and forget the parking. Take your own car, if you can, and see how easy it is to enter, turn and park.

Parking belongs on the apartment handover checklist too.

What to look for

  • Your parking space marked or numbered, as stated in your agreement
  • Enough room to open the doors and move around the car
  • Ramps that are not too steep, with a non-slip surface
  • Good lighting and clear drainage in the parking area
  • Provision for EV charging, if you plan to buy an electric car

15. Security and Power Backup

These two features decide how safe and comfortable the building feels on an ordinary evening or during a power cut. Ask to see them working, and not only listed on paper.

What to look for

  • CCTV cameras covering the entrance, lobby and parking, with a working monitor
  • An intercom or entry system that connects to your flat
  • A generator that starts when the power fails
  • Clear details of what the generator covers: common lighting, lifts, water pumps, or your apartment as well

A complete apartment handover checklist ends with a conversation, not just a signature. When you finish, sit down with the builder’s representative and go through your list of problems together. A good builder will agree to a date for each repair, in writing.

What You Can Inspect in a Forus Home

Every builder should be willing to show you what they have promised. Here are the features listed on our project pages, matched to the checks above. During your visit, ask our team to show each one working.

Add these as extra lines to your own apartment handover checklist

Forus Lavender, C R Iyyunni Road

  • Lifts: one 13-passenger and one 8-passenger lift.
  • Security: 24-hour CCTV surveillance, provision for round-the-clock security and biometric access control at the main lobby.
  • Power: power-generator backup and a solar-powered on-grid system for common areas.
  • Services: a reticulated gas system, provision for internet connection, a fire-fighting system as per statutory norms and a sewage treatment plant.
  • Finish: vitrified flooring, a granite or vitrified kitchen counter with a stainless-steel sink, powder-coated glazed aluminium windows and modular electrical switches.

Forus Gazania, Punkunnam

  • Lifts: one 13-passenger and one 8-passenger lift.
  • Security: 24-hour CCTV surveillance, an intercom and provision for round-the-clock security.
  • Power: a standby generator for common lighting, lifts and water pumps, with limited power backup to individual apartments, plus a solar-powered on-grid system for common areas.
  • Parking: EV-charging points at all parking spaces.
  • Services: a fire-fighting system as per statutory norms, a sewage treatment plant, a solid waste disposal system and provision for optical-fibre internet.
  • After-sales: customer assistance is listed among the project’s features.

Both projects are registered with K-RERA. See the full details on the Forus Lavender and Forus Gazania pages.

Common Handover Mistakes to Avoid

  • Rushing the inspection: two hours is not too long. Come back with a second person if you need to.
  • Skipping the paperwork: a perfect flat with missing documents is still a risk.
  • Accepting verbal promises: if the builder agrees to fix something, ask for the date in writing.
  • Forgetting the common areas: the lift, parking and fire safety matter as much as your living room.
  • Ignoring the final costs: plan for registration charges and move-in expenses. See our guide to the Kerala land registration fee.

Your Snag List Template

A snag list is simply a written record of every defect you find. Copy this format into your notebook or phone, and complete it room by room on handover day.

RoomProblem foundPhoto takenDate agreed to fix
Living roomExample: socket not working near the TVYesAgree in writing
BathroomExample: water collecting in the cornerYesAgree in writing
KitchenExample: chip on the counter edgeYesAgree in writing

Keep a copy signed by both you and the builder’s representative. With this list, your apartment handover checklist becomes a record you can rely on later.

Frequently Asked Questions

What should I check on handover day?

Check the documents first, then inspect your flat room by room, and then walk through the lifts, parking, fire safety and security. An apartment handover checklist with 15 points, like the one in this guide, keeps you from missing anything.

How long does a handover inspection take?

Plan for at least two hours for the flat and another hour for the common areas. Do not let anyone hurry you, because a thorough apartment handover checklist takes time to complete.

Should I take the keys if there are small defects?

Many buyers take the keys once the builder agrees, in writing, to fix minor defects by an agreed date. For serious problems such as leaks or missing documents, wait until they are resolved. If you are unsure, ask your lawyer.

Documents come first on every apartment handover checklist.

Can I bring someone with me?

Yes. A family member, an engineer or a lawyer can help you spot problems and keep notes while you work through the apartment handover checklist.

Where can I see a Forus project before I decide?

Call us on 8086494949 or use our contact page, and our team will arrange a site visit. You can also compare all our flats in Thrissur and read how to choose an apartment in Thrissur before you book.

Visit and Inspect

The best way to understand an apartment handover checklist is to see a real project with it in your hand. Call 8086494949 or book a site visit online.

Forus Initiatives, 4th Floor, Forus n Williams, Sankarayya Road, Poothole, Thrissur – 680004

2026 Forus Builders, All Rights Reserved